No.416 Jianye Road, South Jinqiao Area, Pudong, Shanghai, China
  • +86-21-58386256
  • No.416 Jianye Road, South Jinqiao Area, Pudong, Shanghai, China

built up spray grout morth or water mix macadam

MORTH – Asphalt in India

Nov 17, 2013· The Built-Up Spray Grout (BUSG) is no different. The remaining three are dense graded (desirable) mixes. Examples are: Dense Bituminous Macadam (DBM) Grading 2; Bituminous Concrete (BC) Grading 1; and Bituminous Concrete (BC) Grading 2.

for Resilient Reconstruction of Flood Damaged Rural Roads

504 Bituminous Macadam 505 Built-Up Spray Grout 506 Modified Penetration Macadam 507 Surface Dressing 508 20 mm Thick Premix Carpet 509 Mix Seal Surfacing 510 Seal Coat 512 Modified Bitumen Section 600 BRICK WORK FOR STRUCTURES 132 to 138 Section 700 STONE MASONRY FOR STRUCTURES 139 to 145

Road Software

Water Bound Macadam - WBM: Dry Bound Macadam: Prime Coat: Tack Coat: Liquid Seal Coat: Bituminous Penetration Macadam - BPM: Built-Up Spray Grout - BUSG: Surface Dressing - SD: Fog Spray: Bituminous Macadam - BM: Dense Bituminous Macadam - DBM: Semi Dense Bituminous Concrete - SDBC: Bituminous Concrete - BC

Indian Roads Congress—Public Safety Standards of India

Sep 20, 2015· Standard Specifications and Code of Practice for Water Bound Macadam: IRC 020: 1966: Recommended Practice for Bituminous Penetration Macadam (Full Grout) IRC 021: ... Tentative Specification for Built-Up Spray Grout: IRC 048: 1972: Tentative Specification for Bituminous Surface Dressing Using Precoat Aggregates ... Guidelines for Wet Mix ...

GOVT. OF ASSAM

4.15 Water Bound Macadam using crushed slag 27 4.16 Cement Bound Granular Material sub-base/base 27 4.17 Crusher Run Macadam Base 27 4.18 Brick Soiling 28 4.19 Stone Set Pavement 28 5 Bases and Surface Courses (Bituminous) Preamble 5.1 Prime coat 30 5.2 Tack coat 30 5.3 Bituminous Macadam 31 5.4 Built up spray Grout 31 5.5 Modified Penetration ...

Irc sp 83 2018 free download pdf

IRC:19-2005 Standard Specification and Code of Practice for Water Bound Macadam (Third Revision) 17. IRC:20-1966 Recommended Practice for Bituminous Penetration Macadam (Full Grout) 18. ... 45. IRC:47-1972 Tentative Specification for Built-up Spray Grout 46. IRC:48-1972 Tentative Specification for Bituminous Surface Dressing Using Precoated ...

C 5

Open graded aggregate mix with minimum size of aggregates as 18 to 25 mm is rolled Grout made of coarse sand, cement and water is prepared The proportion of cement to sand is taken as 1:1½ to 1:2½ Grout is applied on the surface and is allowed to …

STANDARD SCHEDULE OF RATES 2009 - HP

(Graded Stone aggregate for water Bound macadam) 50mm to 20mm size ; Cum . 440.00 : 020103010200 . Aggregate at quarry site. (crushed) ... (for built up spray grout) Key aggregate. Cum . 350.00 : 020103030100 . Aggregate Crushable type as moorum or ... For wet mix macadam . 020104030100 . Aggregate for 37.5mm maximum size 22.4mm to 5.6mm ; cum ...

Quality Assurance Handbook for Rural Roads

411 Crusher-Run Macadam Base 412 Brick Soling 413 Stone Set Pavement Section 500 BITUMINOUS CONSTRUCTION 83 to 120 501 Preparation of Surface 502 Prime Coat Over Granular Base 503 Tack Coat 504 Bituminous Macadam 505 Built-Up Spray Grout 506 Modified Penetration Macadam 507 Surface Dressing 508 20 mm Thick Premix Carpet 509 Mix Seal …

43 - hsamb.org.in

Providing & laying tack coat on new water bound Sqm macadam surface including cost of bitumen grade VG- 10 as per IS: 73 75kg/100 Sqm. complete in all respect ... mm thick (compacted) wearing coat to built up spray grout specification including making side dowels carrying the metal from stack and spreading the ... mix plant against two ...

IRC SPECIFICATIONS, STANDARDS, DESIGN CODES - Help The ...

Standard Specification and Code of Practice for Water Bound Macadam (Third Revision) 17. IRC:20-1966: ... Tentative Specification for Built-up Spray Grout: 46. ... Use of Cold Mix Technology in Construction and Maintenance of Roads …

250+ TOP MCQs on Highway Materials – Sub Base and Base ...

b) Bituminous macadam c) Built-up spray grout d) Bituminous penetration macadam Answer: b Clarification: In the bituminous macadam, the aggregates and the bitumen are mixed in a hot mix plant and then transported to the sites to be laid. The aggregates are hence completely coated with bitumen and have better wear-resistant.

Morth Standarddatabook [mwl1v89d0vlj]

50 mm thick 75 mm thick Built-Up-Spray Grout (Providing, laying and rolling of built-up-spray grout layer over prepared base consisting of a two layer composite construction of compacted crushed coarse aggregates using motor grader for aggregates. key stone chips spreader may be used with application of bituminous binder after each layer, and ...

BITUMEN MIXES FOR ROAD - SlideShare

9. ASPHALT CONCRETE OR (BITUMINIOUS MIXTURE) Asphalt concrete is a composite material commonly used in construction projects such as road surfaces, airports and parking lots. It consists of asphalt (used as a binder) and mineral aggregate mixed together Hot mix asphalt concrete (commonly abbreviated as HMAC or HMA) is produced by heating the ...

Bituminous Mix Design | Road Surface | Asphalt

Built-up spray grout (Clause 506) It consists of two-layer composite construction of compacted crushed coarse aggregate with application of bituminous binder after each layer and key aggregates on top for the second layer. It is similar to Penetration Macadam but with less interlock and binder. Uses It is used only for emergency repair work and ...

constructionofflexiblepavements-161120185245.pdf ...

TYPES 1 Bituminous Macadam 2 Penetration Macadam 3 Built up Spray Grout BM consist of crushed aggregate and bituminous binder heated and mixed in a hot mix plant at specified temperature, transported to the site, laid with mechanical paver and compacted by roller.

BRUHAT BENGALURU MAHANAGARA PALIKE

Construction of Water Bound Macadam roads 3.3. Wet Mix Macadam 3.4. Stabilization to improve CBR values 3.5. Re-metalling 3.6. Preparation for surface dressing 3.7. Under wet conditions ' ... Built up spray grout 6.3.5. Semi dense bituminous concrete 6.3.6. Close graded premix surfacing/mixed seal surfacing 6.3.7. Bituminous concrete

PowerPoint Presentation

MORTH Specification-Section. Section up to 3200. Flexible pavement Construction. ... Built Up Spray Grout. Base course. WBM-Waterbound Macadam. Upper Granular sub base- Open graded –Grad III, IV. WMM-WetMix Macadam. ... Water bound macadam (WBM) Wet mix macadam (WMM) Treated soil.

Types of Bitumen Mixes for Pavements -Applications in Road

The void content is 20 to 25% higher than the dense graded bitumen (DBM). The DBM have a void content of 3 to 5%. The BM have high potential to attract water and moisture. Built-up spray Grout (BUSG) For flexible pavements, BUSG has been recommended as a base course. It is a two-layer composite construction with single size aggregates, which ...

PowerPoint Presentation

- Open graded pre-mix carpet. Surface/Wearing course -Name. Binder course-Name. BM-Bituminous macadam. DBM-DenseBituminous Macadam. BUSG- Built Up Spray Grout. Base course. WBM-Water bound Macadam. WMM-Wet Mix Macadam. Shoulder- Provide support and confinement. Subgrade soil/Existing Soil. Compacted Sub-grade/Borrowed Sub …

Right Grade of Bitumen for Flexible Pavements: Indian ...

They may be thick or thin, hot or cold, plant-mixed or site-mixed etc. Some examples are Bituminous Macadam (BM), Premix Carpet (PC/PMC), Dense Bituminous Macadam (DBM), Bituminous Concrete (BC/DBC), Built Up Spray Grout …

Reasphalting Tar Road In Front Of Amc School N 7 A Tender ...

Jan 07, 2020· Providing, laying and compacting of built-up-spray grout layer 75 mm thick over prepared base consisting of two layers composite construction of compacted crushed coarseaggregates with application of bituminous binder of VG-30Grade @ 1.520 Kg/ Sqm after each layer, ( i.e 1.520x2=3.04say 3.00 Kg/Sqm) and with key aggregates placed on top ofthe ...

Morth (Ministry of Road Transport and Highways) Important ...

404 : water bound madacam sub-base / base. 405 : crushed cement concrete sub- base / base. 406 : wet mix macadam sub-base / base. 407 : shoulders, islands and median. 2 408 : cement concrete kerb and kerb with channel. 409 : foot paths and saperators. 410 : crusher-run macadam base.

INDIAN ROADS CONGRESS - IRC

45. IRC:47-1972 Tentative Specification for Built-up Spray Grout 80.00 20.00 46. IRC:48-1972 Tentative Specification for Bituminous Surface Dressing Using Precoated Aggregates (Amalgamated with IRC:110-2005) 47. IRC:49-1973 Recommended Practice for the Pulverization of Black Cotton Soils for Lime Stabilisation (Amalgamated with

Construction & Quality Control of Flexible Pavements

DENSE BITUMINOUS MACADAM (DBM) DBM is Closely Graded DBM is used as a Binder Course for pavements subjected to heavy traffic Hydrated Lime or Cement shall be used as filler, if the mix fails to meet the water sensitivity requirement. PHYSICAL REQUIREMENTS OF COARSE AGGREGATES FOR DBM ... BUILT-UP SPRAY GROUT. BUILT-UP SPRAY …

BITUMINOUS ROADS - Engineering TiCh

Feb 24, 2019· Grouted Macadam This is the method of bituminous road construction in which the aggregates are bound together by grouting or penetrating bitumen into the voids in full or part depth of compacted aggregates. It is called grouted or penetrated method. This method is also called built-up spray grout macadam.

Aggregate Abrasion Value Test - Learning Technology

Nov 29, 2019· Water Bound Macadam road (WBM), sub-base course: 60. 2. WBM base course with the bituminous surfacing . 50. Bituminous Macadam base course: Built-up spray grout base course . 3. WBM surfacing course . 40. Bituminous Macadam binding course: Bituminous penetration Macadam: Built-up spray grout surface course: 4. Bituminous carpet surface …

Bituminous Mix Design | Road Surface | Asphalt

Bituminous Mix Design - Free download as Powerpoint Presentation (.ppt / .pptx), PDF File (.pdf), Text File (.txt) or view presentation slides online. this presentation deals with Bitumen Mix Design

Glossary of Abbreviations - cag.gov.in

5 BM Bituminous Macadam 6 BUSG Built up Spray Grout ... 53 MoRTH Ministry of Road Transport and Highways 54 MP Member of Parliament 55 MPCB Manipur Pollution Control Board 56 MPLADS Member of Parliament Local Area Development ... 101 WBM Water Bound Macadam 102 WMM Wet Mix Macadam .

250+ TOP MCQs on Construction of Flexible Pavement – 1 and ...

c) Built-up Grout d) Penetration Macadam. Answer: d Clarification: The figure is a representation of the principle of penetration macadam. The binder is poured over compacted aggregates and allowed to penetrate into the voids to seal them. Similar process but in two layers comprises the built-up spray grout.

CATALOGUE OF IRC PUBLICATIONS

39. IRC:47-1972 Tentative Specification for Built-up Spray Grout 80.00 20.00 40. IRC:50-1973 Recommended Design Criteria for the Use of Cement Modified Soil in Road Construction 60.00 20.00 41. IRC:52-2001 Recommendations About the Alignment Survey and Geometric Design of Hill Roads (Second Revision) 120.00 20.00 42.

Construction of flexible pavements - SlideShare

TYPES 1 Bituminous Macadam 2 Penetration Macadam 3 Built up Spray Grout 18. BM consist of crushed aggregate and bituminous binder heated and mixed in a hot mix plant at specified temperature, transported to the site, laid with mechanical paver and compacted by roller. Two different gradation are used as suggested by IRC.

Welcome to Employee Area of PWD eDSR - View e DSR

Providing, laying and compacting of Built-up-spray grout layer 75 mm thick over prepared base consisting of two layers composite construction of compacted crushed coarse aggregates with application of bituminous binder of bitumen of specified Grade @ 1.520 Kg/Sq.m after each layer, (i.e 1.520x2=3.04 say 3.00 Kg/Sq.m) and with key aggregates ...

SDBC | Bituminous Mixes in India

Nov 21, 2013· The Built-Up Spray Grout (BUSG) is no different. The remaining three are dense graded (desirable) mixes. Examples are: Dense Bituminous Macadam (DBM) Grading 2; Bituminous Concrete (BC) Grading 1; and Bituminous Concrete (BC) Grading 2.

SPECIFICATIONS FOR ROAD AND BRIDGE WORKS

404 water bound macadam 112 sub-base/base 405 crushed cement concrete 121 sub-base/base 406 wet mix macadam sub -base/ 123 base 407 shoulders, islands and median 128 408 cement concrete kerb and 130 kerb with channel 409 foot paths and separators 132 ... macadam 506 built -up spray grout 160. iii contents section section clause clause title ...

Aggregate Impact Value Test | Impact Test Of Aggregate ...

Water Bound Macadam (WBM) Sub- Base Course: 50: 2: Cement Concrete, Base Course: 45: 3: i) WBM base course with bitumen surfacing: 40 : ii) Built up- Spray grout, base course : 4: Bituminous macadam, base course: 35: 5: i) WBM, surface Course ii) Buit-up spray grout, surface course iii) Bituminous penetration macadam iv) Bituminous macadam ...